Normal Question For Edge Protector Production(2)

- Nov 23, 2018 -

Normal Question For Edge Protector Production(2)

5. Production Flow

image

6. How long it takes to change different size for L shape edge?

L shape size is changed through changing paper and adjusting some related parts. It takes about 20 minutes.

image

7. When can we change L shape size?

To save paper and save time, it is better to produce same size in one day without pause.

8. How long it takes to change L shape mould into U shape mold for SANPL-120A and SANPPL120-DLF line?

For SANPPL-120A, it will take about 2 hours. No need to change tools for SANPPL-120DLF line and

SANPPL-120DLUF line. SANPPL-120G is only for L production.

image

9. How long it takes for the finished product to be dry?

After production, the edge boards can be transported and handled. No need to spend special time drying

them. They will be dry in 2-3 days.

10. Max. quantity of Layer

13 layers, or more if customer has special demand.